DE60LF

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2005-03-25
Personnel T.S. and S.C.
Temperature (°F) 39
Humidity (%) 88
Wind Direction N
Wind Speed (MPH) 5
Barometer (in.Hg) 29.92

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporationg a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems with the tow or towing interface were encountered.