60 BRT

NORTH AMERICAN BUS INDUSTRIES Pdf Download PDF Report

Static Towing Test Data Form

Date: 2005-03-22
Personnel: E.D., E.L., T.S. and S.C.
Temperature: 48

 

Inspect right front tow eye and adjoining structure.
Comments: Welds verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation observed.
Inspect left front tow eye and adjoining structure.
Comments:
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments:
Inspect right rear tow eye and adjoining structure.
Comments: Welds verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation observed.
Inspect left rear tow eye and adjoining structure.
Comments:
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments:
General comments of any other structure deformation or failure:
None noted.