94187

Terra Transit Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2001-06-22
Personnel S.C. and T.S.
Temperature (°F) 75
Humidity (%) 80
Wind Direction W
Wind Speed (MPH) 6
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed. No damage or deformation was observed and no problems were encountered with the towing interface.
Description and location of any structural damage Note noted.
General Comments