CTS RE

CHAMPION BUS INC. Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1899-12-29 Temperature:
Personnel: Test Load (lbs):
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.448 0.448 0.120 0.120
2 0.000 0.062 0.062 0.023 0.023
3 0.000 0.178 0.178 0.036 0.036
4 0.000 0.259 0.259 0.045 0.045
5 0.000 0.211 0.211 0.048 0.048
6 0.000 0.088 0.088 0.090 0.090
7 0.000 -0.047 -0.047 0.068 0.068
8 0.000 0.191 0.191 0.028 0.028
9 0.000 0.223 0.223 0.026 0.026
10 0.000 0.146 0.146 0.015 0.015
11 0.000 0.153 0.153 0.008 0.008
12 0.000 0.295 0.295 0.086 0.086

Loading Sequence: 1

Date: 1899-12-29 Temperature:
Personnel: Test Load (lbs):
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.120 0.328 0.208 0.124 0.004
2 0.023 0.060 0.037 0.023 0.000
3 0.036 0.165 0.129 0.036 0.000
4 0.045 0.236 0.191 0.042 -0.003
5 0.048 0.193 0.145 0.046 -0.002
6 0.090 -0.004 -0.094 0.093 0.003
7 0.068 -0.033 -0.101 0.072 0.004
8 0.028 0.177 0.149 0.026 -0.002
9 0.026 0.211 0.185 0.028 0.002
10 0.015 0.144 0.129 0.018 0.003
11 0.008 0.052 0.044 0.010 0.002
12 0.086 0.281 0.195 0.089 0.003