HOMETOWN VILLAGER

DOUBLE K INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2005-02-04
Personnel S.C. and T.S.
Temperature (°F) 38
Humidity (%) 66
Wind Direction nw
Wind Speed (MPH) 8
Barometer (in.Hg) 30.07

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A rear lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems were encountered with the tow or towing.