EASYON-LF72

GLAVAL BUS Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2005-03-07
Personnel E.L., & E.D.
Temperature (°F) 52
Humidity (%) 55
Wind Direction SW
Wind Speed (MPH) 6
Barometer (in.Hg) 29.96

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems were encountered with the tow or towing interface.