AMERIVAN

ELDORADO NATIONAL Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2005-01-20 Temperature: 68
Personnel: E.D., E.L., T.S. and S.C. Test Load (lbs): 2250
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.020 -0.020 0.008 0.008
2 0.000 0.018 0.018 0.010 0.010
3 0.000 0.031 0.031 0.001 0.001
4 0.000 0.038 0.038 0.002 0.002
5 0.000 0.027 0.027 0.004 0.004
6 0.000 0.018 0.018 0.001 0.001
7 0.000 0.035 0.035 0.003 0.003
8 0.000 0.010 0.010 0.005 0.005
9 9.000 0.010 -8.990 0.003 -8.997
10 0.000 0.013 0.013 0.004 0.004
11 0.000 0.010 0.010 0.003 0.003
12 0.000 -0.013 -0.013 0.007 0.007

Loading Sequence: 1

Date: 2005-01-20 Temperature: 68
Personnel: E.D., E.L., T.S. and S.C. Test Load (lbs): 2250
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.008 -0.019 -0.027 0.010 0.002
2 0.010 0.020 0.010 0.006 -0.004
3 0.001 0.034 0.033 0.002 0.001
4 0.002 0.040 0.038 0.003 0.001
5 0.004 0.026 0.022 0.008 0.004
6 0.001 0.026 0.025 0.001 0.000
7 0.003 0.041 0.038 0.003 0.000
8 0.005 0.013 0.008 0.006 0.001
9 0.003 0.012 0.009 0.003 0.000
10 0.004 0.015 0.011 0.004 0.000
11 0.003 0.011 0.008 0.003 0.000
12 0.007 -0.017 -0.024 0.009 0.002