AMERIVAN

ELDORADO NATIONAL Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2005-03-23
Personnel DL and KD
Temperature (°F) 32
Humidity (%) 50
Wind Direction w
Wind Speed (MPH) 6
Barometer (in.Hg) 30.11

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front wheel lift tow was performed.
Description and location of any structural damage
General Comments None noted.