240 TRANSTECH

ELDORADO NATIONAL Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2005-06-15
Personnel T.S., & S.C.
Temperature (°F) 78
Humidity (%) 57
Wind Direction WSW
Wind Speed (MPH) 9
Barometer (in.Hg) 26.67

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems were encountered with the tow or towing interface.